A Private AI Factory, Engineered as One System and Handed Over as an Asset You Own.
Site, power, cooling, racks, fabric, compute and storage designed together for Blackwell Ultra and Vera Rubin generations — from a single liquid-cooled row to 64+ racks — delivered under one contract with one accountable engineering team.
Who This Is For
- AI labs and model companies that have outgrown rented capacity and want a cluster they control
- Enterprises standing up a private training or inference zone inside their own facility or a colo cage
- Research institutions and universities funding a multi-year GPU asset rather than cloud credits
- Investors and developers who need a powered shell turned into a leasable AI hall
What's Included
Workload-To-Rack Sizing
Training and inference profile translated into GPU count, memory, interconnect topology and storage bandwidth before any hardware is specified.
Facility Engineering
Electrical one-lines, mechanical schematics, slab loading (1,600 kg racks), containment and pathway — stamped drawings ready for permit.
Rack and Fabric Design
NVL72 or HGX rack configurations, rail-optimised InfiniBand or Spectrum-X fabric, 800G optics plan, GPUDirect storage network.
Procurement at Partner Pricing
Allocation and lead-time management across NVIDIA, Supermicro, Dell, Vertiv, CoolIT, Arista and distribution — one bill of materials, one PO to us.
Installation and Integration
Rack-and-stack, liquid loop fill and leak test, structured cabling certified to 800G, power commissioning and thermal mapping.
Bring-Up and Handover
Burn-in, fabric tuning, scheduler and observability stack, documentation and operator training. Optional transition into our managed NOC.
Reference Specifications
Starting points. Every engagement is engineered to the workload, site and budget in front of us.
| Compute | NVIDIA GB300 NVL72 (72 GPUs / rack), HGX B300 8-GPU nodes, Vera Rubin NVL144-ready; AMD MI355X on request |
|---|---|
| Rack density | Up to 140 kW per rack; direct-to-chip cold plates with row CDUs, rear-door HX for 40–60 kW air-adjacent rows |
| Power | 415 V 3-phase to 33 kW+ OCP power shelves per rack, N+1 or 2N UPS, 800 VDC-ready overhead busway |
| Fabric | Quantum-X800 InfiniBand or Spectrum-X Ethernet, rail-optimised two-tier topology, 1.6T-ready optics and trunks |
| Storage | VAST, WEKA or DDN parallel filesystem sized to checkpoint cadence; NVMe tier with GPUDirect Storage |
| Software | Kubernetes or Slurm, NVIDIA Mission Control, Prometheus/Grafana, DCIM integration to breaker level |
| Deliverables | Stamped drawings, BOM with serials, commissioning reports, as-builts, runbooks |
How We Deliver
- 1
Discovery and Sizing
Weeks 1–2Workload interviews, site survey, utility and cooling capacity review. Output: sized design basis and budgetary estimate.
- 2
Engineering
Weeks 3–6Electrical, mechanical, structural and network design packages. Long-lead procurement starts in parallel.
- 3
Build and Install
Weeks 6–12Facility fit-out, CDU and busway installation, rack delivery and integration, cabling certification.
- 4
Commission and Hand Over
Weeks 12–14L1–L5 commissioning, burn-in, fabric and storage tuning, documentation, operator training.
Questions We Get Asked
Can you build inside a colocation cage rather than our own building?
Yes. Most medium deployments land in a colo cage. We handle the landlord engineering review, slab and power confirmation, and the liquid-loop interface with the facility's chilled-water plant.
How do you handle GPU allocation and lead times?
We place orders through partner programs and distribution with allocation visibility, and we design the schedule around confirmed ship dates. Where allocation is tight we propose a phased rack delivery so the facility work is never waiting on silicon.
Do we have to use your managed operations afterwards?
No. Handover includes everything your team needs to operate the cluster. Managed NOC is a separate, optional engagement.
Request a Quotation
Pre-tagged as AI factory design & build. A solutions engineer responds the same business day.